# Future Projects A place for rough ideas and future work items that Alister can explore later. ## Projects - [ ] Stop-motion animation project — see [[concepts/stop-motion-animation-project|Project: Stop-Motion Animation]]; Linux VM/Docker capture, USB camera pass-through, mobile phone shutter release - [ ] Server ↔ desktop swap — power down current stack, detach NVMe, transfer between chassis, boot into new system without data loss (NVMe hot-swap possible on some motherboards; may need reinstallation of OS/lacking drivers) - [ ] Networking infrastructure upgrade — replace switches with 2.5GbE managed switches, add 2.5GbE NICs to desktop, install SFP+ transceivers and run fibre between switches; switches must support link aggregation (LACP) for the Synology; verify the Synology model itself supports link aggregation